Pilot Project (ERP Advanced Replacement Pre-Research)

Provides full-phase services from pre-research to operations, supporting digital transformation and localization replacement.

Functional Overview

Provides full-phase services covering "pre-research → consensus → project approval → implementation → operations," including core modules such as pilot projects, consulting and implementation, technical O&M, environment deployment, and certification training, supporting two scenarios: digital transformation (adopting ERP) and localization replacement (switching ERP).

Customer Pain Points

  • For central SOEs, the 2027 "replace as much as possible" localization goal is difficult, with "no time to wait and high trial-and-error costs," lacking reusable methodologies and tools.
  • There is insufficient understanding of the adaptability of AI-native localization advanced replacement solutions such as allmeta Ecore with existing business and peripheral systems, leading to insufficient confidence in "adopting" or "replacing."
  • Lack of hybrid teams who understand business, technology, and localization, resulting in insufficient project implementation capabilities.
  • Decision-makers lack intuitive basis for judging the cycle, investment, and risks of replacement projects.

Solution Advantages

  • Three-stage structured advancement: top-level design · solution pre-research → solution refinement · standard formulation → prototype implementation · go-live validation, with deliverables at every step and controllable risks.
  • Four clear deliverables: reliable solution (detailed design + configuration templates), clear path (roadmap + resource budget), mature team (FDE + certification), and decision confidence (verification report + executive presentation).
  • Seamless connection with subsequent implementation: pilot results are directly used in the system promotion phase, avoiding duplicated work.
  • Built-in ERP companion validation: in the prototype environment, the feasibility of integrated switchover tools and data migration tools is verified in advance.

Architecture Diagram

Architecture Diagram